The work required the erection of extensive scaffolding as repairs are widely spread and a lot are at high level on the most exposed parts of the building.
![]() |
This photograph shows part of the scaffolding required for Phase I, in this case the temporary roof over the Cedar Staircase. |
![]() |
This photograph shows the scaffold being erected to the front elevation as part of phase II. |